时间紧迫,哪位英文大师帮忙翻译一下下文?谢谢!

” Put together to pack the bar of steel and move, a two sides of the steel need to do the necessity to prop up at the time.Prop up the piece as 76 welding steel pipes of ф ,1.5-2.0 meters of partition establish.At the same time, because of the steelhigher, while completing its new moon to put together to connect, start construction the personnel must go forward to go the homework in the appropriative ambulation terrace.Operation system high 2.5-3.5 meters, long 4.0 meters,1.5 meters of breadth, the main material adoption scaffold steel pipe, on all sides establish the 150 mms mms-200ses in the terrace bottom high protect the sole, move the terrace to prop up the round to adopt 760 automobile tires.For guaranteeing the accident occurrence, the homework personnel’s injury is lowest, at each one puts together to set up for the industry pillar constitution the steel wire type life assurance line, homework personnel the safety belt padlock is in that life on-line homework.After putting together to pack to complete according to mourn to pack the method definitely mourns the ear welding position to combine to mourn its good, the ear adopts the thick steel plate of 16 mms creation.”

圈主 管理员

待审

热门评论
:
讨论
  • 阅读剩余条回复 加载中...
没有讨论,您有什么看法?
图片审查中...
我的回答: 最多上传一张图片和一个附件
x
x
个人中心
购物车
优惠劵
今日签到
有新私信 私信列表
搜索